- Located near Sweetwater Pavilion
- Construction began in April and is scheduled to open in March 2018
- During construction, employees are encouraged to park in either the existing Main Parking Garage or the new parking lot behind it
- This parking garage will be five stories tall with 800 spaces, which is the same amount as the Main Parking Garage
- There will be a sky bridge connecting the second floor of the garage to the second floor of the Sweetwater Pavilion, near the elevator bank